Wednesday, October 31, 2018

Project House Update: The List 6.0

I'm very very late posting my annual list this year. It was an incredibly busy house year and incredibly busy year just being functioning adults.  Some huge things have gotten done. Some huge things are still in progress. Either way, here's where things stand. 

Also, my husband had been playing with my camera and I didn't realize he had messed with the settings. Some of the pictures are really bad. Sorry about that, but let's be real, I'm too lazy to retake them.

If you'd like to go back and see what we've accomplished in previous years, click one of the older versions of this list below, otherwise, let's see what's changed!


June 2013: Version 1.0
June 2014: Version 2.0
June 2015: Version 3.0
June 2016: Version 4.0
Jone 2017: Version 5.0

* means something Dan wants to do and I am trying to talk him out of.
# means something I want and Dan is ignoring and hoping I'll forget/change my mind.
bold means something new or completed since the last version of the list.

Entryway:


Done: 
Paintedinstalled new light fixture, set up corner table, hung some art, modified closetrepainted and upgraded doorbell, new light, new flooring, new baseboards, new console table
To Do: coat rack.

Dining Room:



Done: Painted, 
hung curtainsinstalled recessed lighting and repaintednew chairshung some art and new shelving, new flooring, new baseboardsTo Do: Find a big statement art piece, new light fixture

Formal Living Room:


Done: Hung curtain rod and curtains, 
hung ceiling fanpaintedupgraded light fixturestiled fireplacebought lampnew floorsarranged furniture and hung art 
To Do: Make mantle for fireplace, new molding, build built-in bookcases, get fireplace working 

Kitchen/Breakfast Nook:



Done: Painted, new ceiling fan in breakfast nook, removed awkward ceiling fan in kitchen, installed new microwave, purchased refrigerator, new floors
To Do: New cabinets, new range instead of built-in oven and cook top, new counter tops, additional lighting under cabinets, pendant lighting over the sink, new bar stools, finish painting chairs for breakfast nook, new windowsills in nook*, new sink.

Great Room:





Done: Paintedpurchased entertainment center, hung art, hung TV, routed cables through the wall, new coffee tableadded more seatingnew ceiling fan*hung star mirror, new floors, new baseboards, new rug, repainted a more subtle color, install floor outlet
To Do: Widen doorway to entryway, add sofa table. 

Master Bedroom:



Done: Painted, installed new ceiling fan, purchased dressers, new blinds bladeshung curtainspurchased bed frame, new floors
To Do: Redo fireplace, install crown molding, new door (instead of stupid sliding pocket door)#, find side table for Dan, more lighting. 

Master Bathroom/Closet:



Done: Replaced sliding glass doorremoved and patched toilet paper holderupgraded toilet room, added storage, new floors in closetTo Do: Paint, new bathroom floor, new vanities, remove overhead dry wall pocket*, new mirrors, add wall sconces, french doors into closet, new shower*, new shelving and organization in closet, chandelier, twinkly lights around top, furniture (including a standing mirror and an island/ottoman), find a cat bed they will sleep in instead of next to 

Guest Room/Guest Bath/Guest Closet:



Done: Painted bookcase and end table, bought bedding, painted room, installed new ceiling fanwindow treatments, magazine shelves, new end table
To Do: New floors, modify/new bed frame, new cabinets and counter top, new toilet, new shower doors, paint bathroom and closet. 

Hallway:



Done: Paint, new lighting, hung art (1 and 2), new floors, new baseboards
To do: Nothing! Done!

Hall Bathroom:

Done: Hung some art, removed drywall and purchased tubremoved carpet and wall to create one space, installed tub, installed recessed lighting
To do: Penny floors!, paint, new toilet, new lighting, new cabinets and countertop* 


Den:



Done: Hung art, new dressernew windownew windowsillnew desknew ceiling fan, new window treatment, removed built-in desks, new floors
To Do: Stain shelving, install cabinets, built-in cat box, paint, new floors, new lighting. 

Workout Room:


Done: New windows and window sills, wiring for ceiling fan, paint, ceiling fan, new lighting, installed blinds
To Do: new floors, base boards, paint closet sliding door frame 

Laundry Room:



Done: Purchased washer and dryer, electrical work on lighting, updated coat closet
To Do: Paint, new floors, move sink into garage, build platform for washer/dryer, purchase deep freezer, straighten out crooked pantry, install some shelving, find bench and storage for shoes, new lighting.

Backyard:




Done: Built Turtle's habitatremoved pokey bush, updated Turtle's house
To Do: Remove gravel, plant some trees, fire pit, build housing to hide pool pipes, convert exterior shower into a shed, replace outdoor lights 

Frontyard:

Done: Removed fountain, planted some trees, removed a ton of dead cactus, new porch lights
To Do: redo driveway, paint garage door, new driveway lights, paint pergola 

Other things we've done: new roof, updated pool solar heating, adobe bricks sealed, built Dan's external shop (Part 12, and 3), added fill dirt
Other things in progress: -

No comments:

Post a Comment