I'm late posting my annual list this year. And, as of right now, there isn't much new on this list since last year. In a couple of weeks, you'll understand why. Some of the biggest projects and updates we've ever accomplished should be wrapping up soon and I am so excited! Right now, we are in completely over our heads, but it will be worth it! And we will have so many things projects to remove from this list next year!
If you'd like to go back and see what we've accomplished in previous years, click one of the older versions of this list below, otherwise, let's see what's changed!
June 2013: Version 1.0
June 2014: Version 2.0
June 2015: Version 3.0
June 2016: Version 4.0
* means something Dan wants to do and I am trying to talk him out of.
# means something I want and Dan is ignoring and hoping I'll forget/change my mind.
bold means something new or completed since the last version of the list.
Entryway:
Done: Painted, installed new light fixture, set up corner table, hung some art, modified closet, repainted and upgraded doorbell, new light
To Do: New flooring, new baseboards, coat rack or console table.
Dining Room:
Done: Painted, hung curtains, installed recessed lighting and repainted, new chairs, hung some art and new shelving
To Do: Find a big statement art piece, new flooring, new baseboards, new light fixture, redo dresser into china cabinet
Formal Living Room:
Done: Hung curtain rod and curtains, hung ceiling fan, painted, upgraded light fixtures, tiled fireplace, bought lamp, new floors, arranged furniture and hung art
To Do: Make mantle for fireplace, new molding, build built-in bookcases, get fireplace working
Kitchen/Breakfast Nook:
Done: Painted, new ceiling fan in breakfast nook, removed awkward ceiling fan in kitchen, installed new microwave, purchased refrigerator
To Do: New floors, new cabinets, new range instead of built-in oven and cook top, new counter tops, additional lighting under cabinets, pendant lighting over the sink, new bar stools, finish painting chairs for breakfast nook, new windowsills in nook*, new sink.
Great Room:
Done: Painted, purchased entertainment center, hung art, hung TV, routed cables through the wall, new coffee table, added more seating, new ceiling fan*, hung star mirror.
To Do: New floors, new molding, maybe repaint a more subtle color#, widen doorway to entryway, add sofa table.
Master Bedroom:
Done: Painted, installed new ceiling fan, purchased dressers, new blinds blades, hung curtains, purchased bed frame
To Do: New floors, redo fireplace, install crown molding, new door (instead of stupid sliding pocket door)#, find side table for Dan, more lighting.
Master Bathroom/Closet:
Done: Replaced sliding glass door, removed and patched toilet paper holder, upgraded toilet room, added storage
To Do: Paint, new floors, new vanities, remove overhead dry wall pocket*, new mirrors, add wall sconces, french doors into closet, new shower*, new shelving and organization in closet, chandelier, twinkly lights around top, furniture (including a standing mirror and an island/ottoman), find a cat bed they will sleep in instead of next to
Guest Room/Guest Bath/Guest Closet:
Done: Painted bookcase and end table, bought bedding, painted room, installed new ceiling fan, window treatments, magazine shelves, new end table
To Do: New floors, modify/new bed frame, new cabinets and counter top, new toilet, new shower doors, paint bathroom and closet.
Hallway:
Done: Paint, new lighting, hung art (1 and 2)
To do: New floors, add baseboards
Hall Bathroom:
Done: Hung some art, removed drywall and purchased tub, removed carpet and wall to create one space
To do: Penny floors!, paint, new toilet, update tub, new lighting, new cabinets and countertop*
Den:
Done: Hung art, new dresser, new window, new windowsill, new desk, new ceiling fan, new window treatment
To Do: Stain shelving, remove desk and install cabinets, built-in cat box, paint, new floors, new lighting.
Workout Room:
Done: New windows and window sills, wiring for ceiling fan, paint, ceiling fan, new lighting, installed blinds
To Do: new floors, base boards, paint closet sliding door frame
Laundry Room:
Done: Purchased washer and dryer, electrical work on lighting, updated coat closet
To Do: Paint, new floors, move sink into garage, build platform for washer/dryer, purchase deep freezer, straighten out crooked pantry, install some shelving, find bench and storage for shoes, new lighting.
Backyard:
Done: Built Turtle's habitat, removed pokey bush, updated Turtle's house
To Do: Remove gravel, plant some trees, fire pit, build housing to hide pool pipes, convert exterior shower into a shed, replace outdoor lights
Frontyard:
Done: Removed fountain, planted some trees, removed a ton of dead cactus, new porch lights
To Do: redo driveway, paint garage door, new driveway lights, paint pergola
Other things we've done: new roof, updated pool solar heating, adobe bricks sealed, built Dan's external shop (Part 1, 2, and 3), added fill dirt
Other things in progress: -
No comments:
Post a Comment