I'm late posting my annual list this year. And, as of right now, there isn't much new on this list since last year. In a couple of weeks, you'll understand why. Some of the biggest projects and updates we've ever accomplished should be wrapping up soon and I am so excited! Right now, we are in completely over our heads, but it will be worth it! And we will have so many things projects to remove from this list next year!
If you'd like to go back and see what we've accomplished in previous years, click one of the older versions of this list below, otherwise, let's see what's changed!
June 2013: Version 1.0
June 2014: Version 2.0
June 2015: Version 3.0
June 2016: Version 4.0
* means something Dan wants to do and I am trying to talk him out of.
# means something I want and Dan is ignoring and hoping I'll forget/change my mind.
bold means something new or completed since the last version of the list.
Entryway:
Done: Painted, installed new light fixture, set up corner table, hung some art, modified closet, repainted and upgraded doorbell, new light
To Do: New flooring, new baseboards, coat rack or console table.
Dining Room:
Done: Painted, hung curtains, installed recessed lighting and repainted, new chairs, hung some art and new shelving
To Do: Find a big statement art piece, new flooring, new baseboards, new light fixture, redo dresser into china cabinet
Formal Living Room:
Done: Hung curtain rod and curtains, hung ceiling fan, painted, upgraded light fixtures, tiled fireplace, bought lamp, new floors, arranged furniture and hung art
To Do: Make mantle for fireplace, new molding, build built-in bookcases, get fireplace working
Kitchen/Breakfast Nook:
Done: Painted, new ceiling fan in breakfast nook, removed awkward ceiling fan in kitchen, installed new microwave, purchased refrigerator
To Do: New floors, new cabinets, new range instead of built-in oven and cook top, new counter tops, additional lighting under cabinets, pendant lighting over the sink, new bar stools, finish painting chairs for breakfast nook, new windowsills in nook*, new sink.
Great Room:
Done: Painted, purchased entertainment center, hung art, hung TV, routed cables through the wall, new coffee table, added more seating, new ceiling fan*, hung star mirror.
To Do: New floors, new molding, maybe repaint a more subtle color#, widen doorway to entryway, add sofa table.
Master Bedroom:
Done: Painted, installed new ceiling fan, purchased dressers, new blinds blades, hung curtains, purchased bed frame
To Do: New floors, redo fireplace, install crown molding, new door (instead of stupid sliding pocket door)#, find side table for Dan, more lighting.
Master Bathroom/Closet:
Done: Replaced sliding glass door, removed and patched toilet paper holder, upgraded toilet room, added storage
To Do: Paint, new floors, new vanities, remove overhead dry wall pocket*, new mirrors, add wall sconces, french doors into closet, new shower*, new shelving and organization in closet, chandelier, twinkly lights around top, furniture (including a standing mirror and an island/ottoman), find a cat bed they will sleep in instead of next to
Guest Room/Guest Bath/Guest Closet:
Done: Painted bookcase and end table, bought bedding, painted room, installed new ceiling fan, window treatments, magazine shelves, new end table
To Do: New floors, modify/new bed frame, new cabinets and counter top, new toilet, new shower doors, paint bathroom and closet.
Hallway:
Done: Paint, new lighting, hung art (1 and 2)
To do: New floors, add baseboards
Hall Bathroom:
Done: Hung some art, removed drywall and purchased tub, removed carpet and wall to create one space
To do: Penny floors!, paint, new toilet, update tub, new lighting, new cabinets and countertop*
Den:
Done: Hung art, new dresser, new window, new windowsill, new desk, new ceiling fan, new window treatment
To Do: Stain shelving, remove desk and install cabinets, built-in cat box, paint, new floors, new lighting.
Workout Room:
Done: New windows and window sills, wiring for ceiling fan, paint, ceiling fan, new lighting, installed blinds
To Do: new floors, base boards, paint closet sliding door frame
Laundry Room:
Done: Purchased washer and dryer, electrical work on lighting, updated coat closet
To Do: Paint, new floors, move sink into garage, build platform for washer/dryer, purchase deep freezer, straighten out crooked pantry, install some shelving, find bench and storage for shoes, new lighting.
Backyard:
Done: Built Turtle's habitat, removed pokey bush, updated Turtle's house
To Do: Remove gravel, plant some trees, fire pit, build housing to hide pool pipes, convert exterior shower into a shed, replace outdoor lights
Frontyard:
Done: Removed fountain, planted some trees, removed a ton of dead cactus, new porch lights
To Do: redo driveway, paint garage door, new driveway lights, paint pergola
Other things we've done: new roof, updated pool solar heating, adobe bricks sealed, built Dan's external shop (Part 1, 2, and 3), added fill dirt
Other things in progress: -
Friday, July 28, 2017
Monday, July 24, 2017
Project House Update: Hitting Pay Dirt
This is a story that has been in the works for months. And only like half of that is because of my laziness in telling the story. I'll start at the beginning.
I follow a lot of blogs. My favorites are the DIY/home improvement/design ones. And in following blogs, I will enter just about every contest one of these bloggers' posts. If it's a Rafflecopter contest, I am in.
And being decent at math, I should have realized that, eventually, odds would dictate that I would finally win something. Back in Oct, Sarah of Ugly Duckling House posted a story about leveling her backyard along with an entry for a free power tool rental through Home Depot, her sponsor for her post. I entered and didn't hear anything, like normal, so I didn't think twice about it.
Cut to several months later in December when I received an email from Sarah saying I had won. She had chosen someone else randomly first, but they never responded so I was second. I had won a $500 credit to use for some sort of power rental at Home Depot! Yay! And she needed a response by the following Monday of what I'd be using the rental for. Boo!
Dan and I immediately started going through our project list to figure out which ones would benefit from power tools and which ones we were ready to tackle. The front runner was the drainage around the shop. When it was originally built, the contractor didn't bring in nearly enough fill dirt and it had been an 18 month fight to keep erosion at bay. Dan had always talked about assembling some friends, buying tons of dirt, and moving it with shovels and wheel-barrows. My thought was that we could save a bunch of time and friendships with using the rental towards a small Bobcat. He didn't believe there was enough space to maneuver a Bobcat around the shop to get the dirt where it needed to be. He wasn't convinced easily, but we drove to Home Depot, measured one of the little Bobcats and he was finally on board.
I worked with the company who was sponsoring the rental and scheduled for the Bobcat to be dropped off for a Friday and Saturday in February. This gave us some time to get our ducks in a row, mainly ordering dirt, and for the weather to warm a bit.
Turns out, as that date approached, my in-laws wanted to swing through town and stay with us to visit some friends and they were quickly roped into sticking around through the weekend to help out. Free labor is awesome.
Here are some 'Before' pics. It's hard to grasp the angle of these slopes in pictures, but most of them weren't walkable. You could see the paint line at the bottom of the walls where the dirt had eroded, leaving the unpainted concrete underneath. In some spots, this unpainted line was several inches thick.
Once things got going, they went fast. Dan ordered 21 tons of dirt. It sounds like a lot, but 21 tons only translated to 21 cubic feet. It was still a lot of dirt, but in the end, we wouldn't have minded more. But when it's piled up on a (too small) tarp in your driveway, it's a lot. There's a tarp hidden somewhere under there, I swear.
I made Dan and his dad come up with a plan first so we could all be on the same page. We needed agreement on priorities and which areas needed the most dirt and which things needed to not get run over. I worked from home since all the rental stuff was in my name and I let those two men have at it. We were lucky because the man who dropped off the rental told us that we were free to keep it until Monday morning for no charge since no one else was planned to use it before then.
Dan and his dad got into a rhythm very quickly. Dan drove the Bobcat and would pick up a load of dirt, drop it approximately where he wanted it, and his dad would spread it around with a shovel while Dan went to refill. In the span of four to five hours, they managed to move and dump almost all of the dirt.
With one day down and the in-laws gone, we had made all the progress we had planned to make. However, we had the Bobcat for two more days so we went going to let it go to waste. In spite of the rain that began, Dan and I set out to landscape all this dirt that we had moved. Over the course of five years, we had formed a large pile of river rock that had been removed from random places around our property. This pile was huge and we've tried to move it by hand before and it's so incredibly taxing. I'll get two buckets into it and give up. But we had a Bobcat, which changed the game.
In order to keep all this new dirt in place, we covered it with a layer of river rock. Dan would bring over a load of rock and I would fit them, interlocking, over the dirt. I was pretty helpful at first but lost steam quickly. In hindsight, I was battling the beginnings of a cold which I am claiming zapped my energy.
Dan did a great job, though. When he too was out of energy, he at least had the foresight to move extra loads of rock to spots around the shop that we could place in the future. I mean, it's kind of a tripping hazard right now, but that's just more motivation to work on that sooner rather than later, right? He even made friends with a rattlesnake that had built a home inside the rock pile.
Here are the 'After' pictures. We've had several big storms over the past few weeks and it's held up well. There will be some additional work that needs to be done, but we'll do that at the tale end of monsoon season. The best part is I can now walk the exterior of the entire structure without sliding down an incline!
Dan even had the skills with the Bobcat to not run over my little plants.
I'm really glad things worked out this way! Big thanks to Sarah and Home Depot for hooking me up with this prize! Sometimes Dan and I over-complicate things, but being able to use this little Bobcat saved us so much time and sanity. I would highly recommend it!
I follow a lot of blogs. My favorites are the DIY/home improvement/design ones. And in following blogs, I will enter just about every contest one of these bloggers' posts. If it's a Rafflecopter contest, I am in.
And being decent at math, I should have realized that, eventually, odds would dictate that I would finally win something. Back in Oct, Sarah of Ugly Duckling House posted a story about leveling her backyard along with an entry for a free power tool rental through Home Depot, her sponsor for her post. I entered and didn't hear anything, like normal, so I didn't think twice about it.
Cut to several months later in December when I received an email from Sarah saying I had won. She had chosen someone else randomly first, but they never responded so I was second. I had won a $500 credit to use for some sort of power rental at Home Depot! Yay! And she needed a response by the following Monday of what I'd be using the rental for. Boo!
Dan and I immediately started going through our project list to figure out which ones would benefit from power tools and which ones we were ready to tackle. The front runner was the drainage around the shop. When it was originally built, the contractor didn't bring in nearly enough fill dirt and it had been an 18 month fight to keep erosion at bay. Dan had always talked about assembling some friends, buying tons of dirt, and moving it with shovels and wheel-barrows. My thought was that we could save a bunch of time and friendships with using the rental towards a small Bobcat. He didn't believe there was enough space to maneuver a Bobcat around the shop to get the dirt where it needed to be. He wasn't convinced easily, but we drove to Home Depot, measured one of the little Bobcats and he was finally on board.
I worked with the company who was sponsoring the rental and scheduled for the Bobcat to be dropped off for a Friday and Saturday in February. This gave us some time to get our ducks in a row, mainly ordering dirt, and for the weather to warm a bit.
Turns out, as that date approached, my in-laws wanted to swing through town and stay with us to visit some friends and they were quickly roped into sticking around through the weekend to help out. Free labor is awesome.
Here are some 'Before' pics. It's hard to grasp the angle of these slopes in pictures, but most of them weren't walkable. You could see the paint line at the bottom of the walls where the dirt had eroded, leaving the unpainted concrete underneath. In some spots, this unpainted line was several inches thick.
Once things got going, they went fast. Dan ordered 21 tons of dirt. It sounds like a lot, but 21 tons only translated to 21 cubic feet. It was still a lot of dirt, but in the end, we wouldn't have minded more. But when it's piled up on a (too small) tarp in your driveway, it's a lot. There's a tarp hidden somewhere under there, I swear.
I made Dan and his dad come up with a plan first so we could all be on the same page. We needed agreement on priorities and which areas needed the most dirt and which things needed to not get run over. I worked from home since all the rental stuff was in my name and I let those two men have at it. We were lucky because the man who dropped off the rental told us that we were free to keep it until Monday morning for no charge since no one else was planned to use it before then.
Dan and his dad got into a rhythm very quickly. Dan drove the Bobcat and would pick up a load of dirt, drop it approximately where he wanted it, and his dad would spread it around with a shovel while Dan went to refill. In the span of four to five hours, they managed to move and dump almost all of the dirt.
With one day down and the in-laws gone, we had made all the progress we had planned to make. However, we had the Bobcat for two more days so we went going to let it go to waste. In spite of the rain that began, Dan and I set out to landscape all this dirt that we had moved. Over the course of five years, we had formed a large pile of river rock that had been removed from random places around our property. This pile was huge and we've tried to move it by hand before and it's so incredibly taxing. I'll get two buckets into it and give up. But we had a Bobcat, which changed the game.
In order to keep all this new dirt in place, we covered it with a layer of river rock. Dan would bring over a load of rock and I would fit them, interlocking, over the dirt. I was pretty helpful at first but lost steam quickly. In hindsight, I was battling the beginnings of a cold which I am claiming zapped my energy.
Dan did a great job, though. When he too was out of energy, he at least had the foresight to move extra loads of rock to spots around the shop that we could place in the future. I mean, it's kind of a tripping hazard right now, but that's just more motivation to work on that sooner rather than later, right? He even made friends with a rattlesnake that had built a home inside the rock pile.
Here are the 'After' pictures. We've had several big storms over the past few weeks and it's held up well. There will be some additional work that needs to be done, but we'll do that at the tale end of monsoon season. The best part is I can now walk the exterior of the entire structure without sliding down an incline!
Dan even had the skills with the Bobcat to not run over my little plants.
I'm really glad things worked out this way! Big thanks to Sarah and Home Depot for hooking me up with this prize! Sometimes Dan and I over-complicate things, but being able to use this little Bobcat saved us so much time and sanity. I would highly recommend it!
Wednesday, July 5, 2017
Project House Update: Easier the Second Time Around
The great thing about finally completing a project is that you understand how easy or hard it is. That way, when you need to do it again, all the uncertainty is gone and you can jump right in.
When we installed blinds in our workout room, the hardest part of the process was finding blinds that would work for us. But once we had ones that we liked, there was no reason to hesitate on pulling the trigger on the ones for the den.
To recap, since the window is arched, we need blinds that can be side-mounted.
Here's what we started with. After Dan installed the window and the windowsill over a year ago, the little finishing touches never got finished.
Once we installed the blinds in the workout room and loved them, I had Dan immediately order matching ones for the den. They arrived remarkably fast and I was all gung-ho to get them installed. Dan brought me down to Earth with the list of things that needed to get done before they could be installed. It was simple stuff like spackling, painting, and caulking, all things I could do.
It took me longer than it should have, but it got done. From there, Dan popped in the blinds. Word of warning (and praise): Dan hung the blinds level, but the window itself apparently wasn't, so it looked really bad. The nice thing about these blinds, though, is that they come with extra installation stickers so we could try again.
I love the look of these blinds! You can't tell they are there unless you're looking for them.
Blinds, with cat for scale.
Seriously, you can't even see the blinds in the up position because of the thickness of the cross-member.
When the full list of house projects gets to be too overwhelming, it's great to cross them off little by little.
When we installed blinds in our workout room, the hardest part of the process was finding blinds that would work for us. But once we had ones that we liked, there was no reason to hesitate on pulling the trigger on the ones for the den.
To recap, since the window is arched, we need blinds that can be side-mounted.
Here's what we started with. After Dan installed the window and the windowsill over a year ago, the little finishing touches never got finished.
Once we installed the blinds in the workout room and loved them, I had Dan immediately order matching ones for the den. They arrived remarkably fast and I was all gung-ho to get them installed. Dan brought me down to Earth with the list of things that needed to get done before they could be installed. It was simple stuff like spackling, painting, and caulking, all things I could do.
It took me longer than it should have, but it got done. From there, Dan popped in the blinds. Word of warning (and praise): Dan hung the blinds level, but the window itself apparently wasn't, so it looked really bad. The nice thing about these blinds, though, is that they come with extra installation stickers so we could try again.
I love the look of these blinds! You can't tell they are there unless you're looking for them.
Blinds, with cat for scale.
Seriously, you can't even see the blinds in the up position because of the thickness of the cross-member.
When the full list of house projects gets to be too overwhelming, it's great to cross them off little by little.
Friday, June 23, 2017
Project House Update: I'm Finally An Expert in Something
One thing is for sure: Dan and I are getting much better at building houses for Desert Tortoises. The first time we built Turtle a house (at our new house), it had only survived two years before needing to be renovated. However, once we rebuilt it, we got almost four years out of it. However, between a pack rat, a bunch of lizards, a tortoise, and the elements, his house was definitely looking more shabby than chic.
The pack rat really made a mess of things again. It dug tunnels under the back of the house under the cinder block and compromised the integrity of the structure. We tried to patch things with additional bricks and rocks, but it wasn't enough and it continued to collapse on itself. With monsoon season less than a month away, I didn't believe the house would survive the daily thunderstorms.
This time, we made a plan, a very detailed one. That's what happens when you have two mechanical engineers who really don't want to have to keep rebuilding a reptile house. The plan was multi-layered.
The huge fly in the ointment was the weather. With monsoon season only a couple of weeks away, we needed to rebuild his house ASAP. However, did you know it gets hot in Arizona? Not only hot, but we had a record-breaking heat wave. The temperatures were supposed to hit 115F and stay there.
It. was. miserable.
We were prepared and woke up bright and early on Sunday morning to beat the heat. It was still 90F by 8AM, but it could have been worse. We drank plenty of water and had sunscreen and protective clothing, but it was still brutal. We tried to work as fast as possible to get out of the sun.
Let me be real here: Dan did almost all the work. He was all the muscle. My contribution was planning and keeping this cheeky, little bastard out of the way. Turtle was incredibly interested in hat we were doing and kept trying to crawl into the middle of it. My job was to, about every 30 seconds, pick him up a couple of inches from the ground, move him five feet, and watch as he turned around and crawled back over. He is a very determined little reptile.
Most of the build went according to plan. Dan thought he had tar paper hoarded in his shop, but he didn't, so we used an insulating automobile fabric instead. I couldn't get the chicken wire to stake down as cleanly as I wanted so it will probably poke out through the dirt eventually. And lastly, the layer of river rocks under the dirt was maybe a half-dozen rocks. It was just too damn hot to try to collect and carry rocks. Turtle was itching to get back in his house so we shoveled dirt back on top and let him in.
His little pack rat buddy will probably move back in soon and try to cause trouble but it should at least be harder for him this time. I'm hoping that planting some creosote bushes along the base of the dirt mount will help keep things neater, too.
We'll see. If this one last five years, it's an improvement over the last design.
The pack rat really made a mess of things again. It dug tunnels under the back of the house under the cinder block and compromised the integrity of the structure. We tried to patch things with additional bricks and rocks, but it wasn't enough and it continued to collapse on itself. With monsoon season less than a month away, I didn't believe the house would survive the daily thunderstorms.
This time, we made a plan, a very detailed one. That's what happens when you have two mechanical engineers who really don't want to have to keep rebuilding a reptile house. The plan was multi-layered.
- Add more cinder blocks so it would be harder for the pack rat to dig tunnels out from under it.
- Stake the cinder blocks with rebar so they would be less inclined to shift if tunnels did form.
- Fill the centers of the cinder blocks with cement to help keep them in place.
- Once the roof was placed back on, add another protective layer on top of the wood with tar paper or sheet metal roofing material.
- Cover the top and sides of the structure with chicken wire and stake it into place. This would help keep the dirt in place on top of it and also hinder the pack rat from digging through it.
- Add a layer of non-smooth river rocks.
- Fill in all the gaps with dirt.
- Eventually, add some desert plants around the structure to prevent erosion.
The huge fly in the ointment was the weather. With monsoon season only a couple of weeks away, we needed to rebuild his house ASAP. However, did you know it gets hot in Arizona? Not only hot, but we had a record-breaking heat wave. The temperatures were supposed to hit 115F and stay there.
It. was. miserable.
We were prepared and woke up bright and early on Sunday morning to beat the heat. It was still 90F by 8AM, but it could have been worse. We drank plenty of water and had sunscreen and protective clothing, but it was still brutal. We tried to work as fast as possible to get out of the sun.
Let me be real here: Dan did almost all the work. He was all the muscle. My contribution was planning and keeping this cheeky, little bastard out of the way. Turtle was incredibly interested in hat we were doing and kept trying to crawl into the middle of it. My job was to, about every 30 seconds, pick him up a couple of inches from the ground, move him five feet, and watch as he turned around and crawled back over. He is a very determined little reptile.
Most of the build went according to plan. Dan thought he had tar paper hoarded in his shop, but he didn't, so we used an insulating automobile fabric instead. I couldn't get the chicken wire to stake down as cleanly as I wanted so it will probably poke out through the dirt eventually. And lastly, the layer of river rocks under the dirt was maybe a half-dozen rocks. It was just too damn hot to try to collect and carry rocks. Turtle was itching to get back in his house so we shoveled dirt back on top and let him in.
His little pack rat buddy will probably move back in soon and try to cause trouble but it should at least be harder for him this time. I'm hoping that planting some creosote bushes along the base of the dirt mount will help keep things neater, too.
We'll see. If this one last five years, it's an improvement over the last design.
Thursday, June 15, 2017
Space Turtle!
Have you ever done one of those 'Drink and Paint' classes? It's the new trend to go to a studio, have a couple of glasses of wine, and have an instructor walk you through a step by step canvas painting. I've always wanted to try one, but I either didn't like the painting subject or couldn't herd my friends into an organized group to try it.
I mean, it wasn't something I was losing sleep over, but it seemed like a fun thing to try. It probably would have never happened until the opportunity was thrust upon me. My sister found a 'Paint Your Patronus' paint party and strong-armed my mom and I into signing up with her. As much as I wanted to try one of these classes, I had some concerns. First, I'm not a big 'Harry Potter' fan. I couldn't care less about my patronus. Secondly, I don't drink so I was conscious of wasting money if drinks were included. And lastly, my mom is an artist. A professional, awesome artist. You can see her work here. My sister inherited the artistic gene from our mother and I got the engineering gene from our father. I didn't want my sister and my mom's paintings to be amazing and awesome and mine just be crap.
But I was signed up, so I picked a patronus, clearly Turtle, and sent a picture of him in to be sketched out in advance.
Typically, these sorts of events happen in a proper painting studio, but this one-off happened in a bar downtown. The other difference between this patronus event and normal events is that everyone had a different painting, a different patronus. Typically at these paint parties, everyone is painting the same sunset or the same tree with little heart leaves. But you really couldn't expect everyone to have the same patronus, right? There were a lot of deer, rabbits, and owls, but I had the only tortoise and one woman had a glass of wine.
It was a fun event, but it was definitely chaotic. Fortunately, each canvas had their patronus pre-sketched onto it so we had some guidelines. Without that, mine would have been a complete mess.
The bar wasn't set up well for the event and I couldn't see any of the sample painting as we went through the steps. It became a weird sort of telephone game of interpreting what I was supposed to do by words only. 'Paint wavy lines starting at your patronus' became 'a background of wavy lines', not what it was supposed to be, smoke coming off the patronus. I didn't have a clue what I was doing most of the time, but that didn't stop me. In hindsight, a tortoise shell had way too many details on it to fit into the painting techniques we were being walked through. My Turtle painting is definitely more 'Space Turtle' than 'Patronus', but I think I like it better that way. Like something from Terry Pratchett, he drifts slowly through space, watching over the galaxy.
And speaking of watching over, I hung him in front of the toilet in the guest room, so he can watch over and judge anyone using the bathroom.
In the future, I'd still like to try a class where we all paint the same thing. My next masterpiece won't be as close to my heart as my Space Turtle, but maybe it will be more along my skill set.
If you are in the Tucson area and would like to try one of these classes, check out Tipsy Picasso.
I mean, it wasn't something I was losing sleep over, but it seemed like a fun thing to try. It probably would have never happened until the opportunity was thrust upon me. My sister found a 'Paint Your Patronus' paint party and strong-armed my mom and I into signing up with her. As much as I wanted to try one of these classes, I had some concerns. First, I'm not a big 'Harry Potter' fan. I couldn't care less about my patronus. Secondly, I don't drink so I was conscious of wasting money if drinks were included. And lastly, my mom is an artist. A professional, awesome artist. You can see her work here. My sister inherited the artistic gene from our mother and I got the engineering gene from our father. I didn't want my sister and my mom's paintings to be amazing and awesome and mine just be crap.
But I was signed up, so I picked a patronus, clearly Turtle, and sent a picture of him in to be sketched out in advance.
Typically, these sorts of events happen in a proper painting studio, but this one-off happened in a bar downtown. The other difference between this patronus event and normal events is that everyone had a different painting, a different patronus. Typically at these paint parties, everyone is painting the same sunset or the same tree with little heart leaves. But you really couldn't expect everyone to have the same patronus, right? There were a lot of deer, rabbits, and owls, but I had the only tortoise and one woman had a glass of wine.
It was a fun event, but it was definitely chaotic. Fortunately, each canvas had their patronus pre-sketched onto it so we had some guidelines. Without that, mine would have been a complete mess.
The bar wasn't set up well for the event and I couldn't see any of the sample painting as we went through the steps. It became a weird sort of telephone game of interpreting what I was supposed to do by words only. 'Paint wavy lines starting at your patronus' became 'a background of wavy lines', not what it was supposed to be, smoke coming off the patronus. I didn't have a clue what I was doing most of the time, but that didn't stop me. In hindsight, a tortoise shell had way too many details on it to fit into the painting techniques we were being walked through. My Turtle painting is definitely more 'Space Turtle' than 'Patronus', but I think I like it better that way. Like something from Terry Pratchett, he drifts slowly through space, watching over the galaxy.
And speaking of watching over, I hung him in front of the toilet in the guest room, so he can watch over and judge anyone using the bathroom.
In the future, I'd still like to try a class where we all paint the same thing. My next masterpiece won't be as close to my heart as my Space Turtle, but maybe it will be more along my skill set.
If you are in the Tucson area and would like to try one of these classes, check out Tipsy Picasso.
Subscribe to:
Posts (Atom)


































































